Proposed Coal Harbour Marina Expansion Project
Proposed Coal Harbour Expansion Project details

Welcome to RVYC's Coal Harbour Marina Expansion Project.
The RVYC Coal Harbour Marina is situated within Coal Harbour at 950 Stanley Park Drive, immediately to the west of Deadman’s Island and east of the Vancouver Rowing Club. Stanley Park is immediately north of the marina.

The purpose of the proposed project is to retrofit, improve, and expand the existing marina. The proposed project would expand the marina from 326 to 372 slips to accommodate an additional 46 vessels. 37 boat sheds would be removed and replaced with new boat sheds of the same design specifications with no net increase in the boat shed numbers on site. Floats are to be replaced and/or reposition, 89 creosote piles are to be removed and disposed of and 24 cylindrical steel piles are to be removed and reused. An additional 110 new steel piles will be installed during the proposed project. The existing water lot lease is proposed to increase to accommodate the expansion. The total project area is approximately 43,000 m2 (462,848 sq. ft) which includes the water lot expansion area of 8,553 m2 (92,063 sq. ft).


Technical Studies
Royal Vancouver Yacht Club Coal Harbour Marina Expansion (PDF - 82 pgs - 5.3 MB)
Appendix A - RVYC Master Plan (PDF - 1.7 MB)
Appendix B - Coal Harbour Channel Design (PDF - 1.5 MB)
Appendix C - HMCS Discovery Letter of Support (PDF - 1 MB)
Appendix D - Parks Board Letter of Approval (PDF - 1 MB
Appendix E - Marina Design (PDF - 1 MB)
Appendix F - Marine Seismic Refraction Bathymetry and Sub Bottom Acoustic Profiling Report ( PDF - 3.7 MB) 
Appendix G - Docks and Floats IMFS (PDF - 1 MB)
Appendix H - Boat Sheds (PDF - 1 MB)
Appendix I - Emergency Response Plan (PDF - 3 MB)
Appendix J - Fire and Life Safety Plan (PDF - 1.5 MB)
Appendix K - Mechanical Design Drawings (PDF - 1 MB)
Appendix L - Electrical (PDF - 5 MB)
Appendix M - Lighting Plan (PDF - 1 MB)
Appendix N - Biophysical Survey of Subtidal Habitat (PDF - 5.6 MB) 
Appendix O - Noise Impact Assessment (PDF - 1 MB)
Drawing Package Marina Expansion (1 of 2) (PDF - 18.8 MB)
Drawing Package Marina Expansion (2 of 2) (PDF - 9.6 MB) 
Aquatic Effects Assessment (PDF - 1 MB)
Construction Environmental Management Plan (PDF - 1.3 MB)
Detailed Construction Staging Memo (PDF - 1 MB)
Rowing Technical Memo (PDF - 1 MB)
View and Shade Memo (PDF - < 1 MB)


The permit application has been submitted to the Vancouver Fraser Port Authority and it is now under review. Application documents are also posted on the Vancouver Fraser Port Authority website.

Public Consultation

Public consultation period lasting 15 business days will be conducted in 2019, where we will invite interested parties to ask questions and provide feedback on our application. Details of the consultation process will be posted here.

Contact Us
For more information, please contact Chris Barnett, Marine Asset Manager by email or phone at 604.834.9492.

For questions regarding the port authority’s Project and Environmental Review process, please contact Emily Williamson by email or phone at 604.665.9586.

  • 3811 Point Grey Road Vancouver, BC V6R 1B3 CANADA
  • 604.224.1344
  • ©2018 All Rights Reserved. Site by Clubessential
FED Scripts
CSS Content